Project at Bac Lieu Hospital
Year implemented: 29/10/2014 Content: Design and construction of a complete installation 5 IPS cabinets (Isolated Power System) for 10 operating theatres of Bac Lieu Hospital.
Year implemented: 29/10/2014 Content: Design and construction of a complete installation 5 IPS cabinets (Isolated Power System) for 10 operating theatres of Bac Lieu Hospital.